Estimation of Direct Runoff and Sediment Yield in an Agnps-gis Link: Case of River Njoro Catchment in Kenya - Hesbon Otieno - Books - LAP LAMBERT Academic Publishing - 9783659315596 - 2013
In case cover and title do not match, the title is correct

Estimation of Direct Runoff and Sediment Yield in an Agnps-gis Link: Case of River Njoro Catchment in Kenya

Price
HK$ 372
excl. VAT

Ordered from remote warehouse

Expected to be ready for shipping Sep 11 - 17
Get notified about new Hesbon Otieno releases
Add to your iMusic wish list

Not rated yet

Most catchments in the developing world are ungauged due to the high cost of instrumentation involved and are therefore not monitored. However, lack of data from these catchments can not be an excuse for lack of proper management and hence data from these catchments is still needed for their management as well as design of structures in these areas. This book illustrates how direct runoff and sediment yield can be estimated in an AgNPS model-GIS link. A case study of the river Njoro catchment in Kenya is used and the results show a possibility of using the method in cases where in-situ measurements are lacking, so long as the model input parameters are accurately determined. Professionals in hydrology, environment and engineering fields or anyone else who may be involved in hydrological modelling will find this book useful.

Media Books     Paperback Book   (Book with soft cover and glued back)
Released 2013
ISBN13 9783659315596
Publishers LAP LAMBERT Academic Publishing
Pages 112
Dimensions 150 × 7 × 225 mm   ·   185 g
Language German